- Filled a dumpster with drywall and other debris from the second floor offices.
- Emptied out the basement to prepare for the jackhammering of the concrete pad this week.
- Demolished a few remaining walls upstairs.
- Took down the florescent lights and suspended ceiling in the office space
- Dropped all the lumber from the old partition walls down from the second floor for future removal.
I also managed to find the weak spot in the floor with the rear wheel of the forklift. After trying to push the stuck three-wheeler out of the hole, Steve correctly figured that we needed to rampantly violate the safety sticker and counter balance the lift if we were going to get it out.
In the end, after a hard day's work, it was Revolution Time and the dust masks came off for the day. Thanks go out to Michael, Steve, Mike, TC, Steve, Josh, Paul, Dan, Elliot, Ravi, Cheryl, Ben and anyone else I missed.